Industry Experts


It takes a team of engineers, security and construction experts, and software developers to run even a modest mining centre, not to mention centres on the scale Miner One is planning. The Miner One Team boasts all of the qualifications and competencies to build, install, and operate industrial-sized mining facilities. Members of the Miner One Team have built and manage(d) the following data centres:

Atlax EO ( (Meninx Holding/Tunisia/North Africa); specifications: Tier III+, ANSI/TIA-942, 1000 m² space (4 x 250 m²), 512 racks, 350 m² office space (open space, meeting rooms, space for rest), multi broadband connection, IXP neutral, 99.982% availability, 24/7 security & monitoring, N+1 for enhanced reliability, PCA ready.

RackRay ( (Lithuania/Russia/Belarus); specifications: Tier III, 700 m2 extendable up to 2500 m2, 140 racks extendable up to 450 racks, power supply 2MW expandable up to 5MW, Visa backup power generators, Emerson PXD120 free cooling system N+1, Eaton UPS N+1, TYCO / LPG fire suppression system, more than 400 fiber optics N+N, 24/7 security and monitoring, ISO/IEC 20000-1:2011, ISO 9001:2015, ISO/IEC 27001:2013.

ATEA BaltNet ( (Lithuania/Norway); specifications: Tia 942, Tier III, power supply 6MW (N+N 3+3), Schneider Electric Power distribution, APC ACRC502 IN-ROW cooling N+N, APC racks, APC Symmetra PX UPS 2xN+1, Emerson, 2 MW Caterpillar backup power generators N+1 with fuel tanks for 48h work, 200 fiber optics extendable up 600, 36 CCTV cameras

Telia ( (Lithuania/Sweden); specifications: Tier I / Tier II / Tier III over 100+ locations – technological premises, server rooms, data centres, technological containers, 300+ racks, Multi Megawatt power supply, Schneider Electric, Eaton, Emerson, APC, Kyoto cooling, Uptime Institute (TIA) certified, ISO 27001 & ISO 20000